Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 28, 2021     Final coax run; Baggage door and top skin - (3.8 hours)       Category: Fuselage
1. Fabricated the final coax connector and installed the last of three coax runs from the panel up to the front side of the firewall.

2. Wire-laced several more areas behind the instrument panel, and also in the avionics hell-hole.

3. Got out all the baggage door components and laid them out with the plans so I can better understand how it will all go together. I had vague recollections of the F-473G hinge support not fitting well several years ago, and sure enough, when I clecoed it in place, there was about a 1/8" gap between the ends of it and both the firewall and bulkhead. Rather than make plans to shim it somehow, I just fabricated another part that's 1/4" longer. Easy-peasy. I also marked where the avionics access door will have to be notched to fit around the hinge support -- although I'll wait to actually notch it until the baggage door is under construction.


 